Man

Patricio Andrés Lamas Vilches

Consultor

Independiente

Santiago, Chile

Líneas de Investigación


Mine project scheduling under uncertainty, underground mine scheduling with refrigeration, cut-off grade optimization, multistage stochastic optimization, mixed-integer programming.

Educación

  •  Ingeniería industrial e investigación de operaciones, UNIVERSIDAD ADOLFO IBANEZ. Chile, 2021
  •  Ingeniero Civil de Industrias, PONTIFICIA UNIVERSIDAD CATOLICA DE CHILE. Chile, 2011
  •  Ciencias de la Ingeniería, PONTIFICIA UNIVERSIDAD CATOLICA DE CHILE. Chile, 2011
  •  Ciencias de la Ingeniería, PONTIFICIA UNIVERSIDAD CATOLICA DE CHILE. Chile, 2008

Experiencia Académica

  •   Profesor Part Time

    UNIVERSIDAD ANDRES BELLO

    Facultad de Ingeniería

    Santiago, Chile

    2019 - 2011

  •   Profesor Part Time

    Academia Politécnica Militar

    Santiago, Chile

    2011 - 2011

  •   Ayudante Part Time

    UNIVERSIDAD ADOLFO IBANEZ

    Santiago, Chile

    2018 - 2019

  •   Profesor Part Time

    UNIVERSIDAD MAYOR

    Facultad de Ingeniería

    Santiago, Chile

    2018 - 2018

Experiencia Profesional

  •   Consultor Part Time

    DICTUC

    Santiago, Chile

    2009 - 2011

  •   Consultor Part Time

    KR Consulting

    Santiago, Chile

    2008 - 2009

Premios y Distinciones

  •   Best Student Paper Competition, Second Prize

    International Conference on Project Management and Scheduling

    Alemania, 2014

    Segundo lugar en competencia del mejor paper de un estudiante, con trabajo titulado: "A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations".

  •   Beca de Doctorado Nacional

    ANID

    Chile, 2018

    Beca de Doctorado Nacional para años 2018-2021.


 

Article (4)

Lane's Algorithm Revisited
Underground mine scheduling under uncertainty
A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
A stochastic programming approach for floods emergency logistics

Proyecto (4)

Large scale optimization and uncertainty=> Challenges in strategic mine planning. An interdisciplinary approach.
Production scheduling=> a mathematical programming approach and applications to natural resource management.
Optimal buffer management in project planning under uncertainty
THE LOGISTICS OF SUPPLY CONVERGENCE TO A SITE OF AN EVENT OF LOW PROBABILITY AND HIGH CONSEQUENCE
4
Patricio Lamas

Consultor

Independiente

Santiago, Chile

1
Adriana Piazza

Profesora Asociada

Escuela de Negocios

Universidad de Chile

Santiago, Chile

1
rodrigo garrido

Profesor Titular

Ingeniería Industrial

FACULTAD DE INGENIERÍA Y CIENCIAS, UNIVERSIDAD DIEGO PORTALES

Santiago, Chile